PartStall
ENG
AccountSign inCart

V5105272AJ — Mounting/Fastening (CHRYSLER)

V5105272AJ is an original part number from CHRYSLER. Part type: Mounting/Fastening. There are 3 replacements to choose from — FEBEST, from €4.84 to €10.90. The replacements fit 141 vehicle versions from MITSUBISHI, VOLVO, JEEP and DODGE between 1991 and 2026.

Replacement parts

Febest MAB-071 Mounting, control/trailing arm
Febest · MAB-071
2 offers
€4.84 5 pcs · Estimated delivery Tue, Dec 1
Febest MAB-088RUB Mounting, control/trailing arm
Febest · MAB-088RUB
€8.38 7 pcs · Estimated delivery Thu, Dec 3
Febest MAB-088Z Mounting, control/trailing arm
Febest · MAB-088Z
€10.90 14 pcs · Estimated delivery Thu, Dec 3

Fits 141 vehicle versions

141 vehicle versions · 4 makes · 17 models · 1991–2026 · 50–217 kW

MITSUBISHI11 models, 76 vehicle versions
VOLVO3 models, 43 vehicle versions
JEEP2 models, 15 vehicle versions
DODGE1 model, 7 vehicle versions

Does it fit your car? Choose the car or enter its registration number and we show only what fits.

How the number is written

The same number is written in several ways — all of them lead here.

CHRYSLERV5105272AJ

Related numbers

The same replacements also carry these original numbers:

05105272AA05105272AB5105272AA5105272AB5105272AC5105272AD5105272AE5105272AF5105272AH5105272AI

Frequently asked

What part is V5105272AJ?

V5105272AJ is an original number from CHRYSLER; the part type is Mounting/Fastening.

Which parts replace V5105272AJ?

FEBEST MAB-071, FEBEST MAB-088RUB and FEBEST MAB-088Z.

Does V5105272AJ fit my car?

The replacements fit 141 vehicle versions from MITSUBISHI, VOLVO, JEEP and DODGE (1991–2026). Choose your car or enter its registration number and we show only what fits.

What does a replacement for V5105272AJ cost?

From €4.84 (FEBEST MAB-071). The dearest costs €10.90.

Is an equivalent part as good as the original?

An equivalent part is made to the dimensions and requirements of the same original number. Every row names its brand, so the choice can be made on the brand and on the figures above.

When does the part arrive?

Every row states its own delivery date, worked out from that part's own stock.