4670 508AD — Steering Links (control arm, trailing link, diagonal arm) (DODGE, CHRYSLER and JEEP)
4670 508AD — the factory original number of DODGE, CHRYSLER and JEEP, category Steering Links (control arm, trailing link, diagonal arm). 2 replacements are in stock (NTY and TRISCAN); the cheapest costs €38.99, the dearest €55.54. According to the manufacturers they fit 20 vehicle versions (DODGE, CHRYSLER and LANCIA) between 2007 and 2026.
Replacement parts
Fits 20 vehicle versions
20 vehicle versions · 3 makes · 4 models · 2007–2026 · 140–527 kW
DODGE2 models, 12 vehicle versions
- DODGE CHALLENGER Coupe2007–… · 6 engines
- DODGE CHARGER2010–… · 4 engines
CHRYSLER1 model, 4 vehicle versions
- CHRYSLER 300C (LX)2011–2023 · 2 engines
LANCIA1 model, 4 vehicle versions
- LANCIA THEMA (LX_)2011–2014 · 2 engines
Does it fit your car? Choose the car or enter its registration number and we show only what fits.
How the number is written
The same number is written in several ways — all of them lead here.
| CHRYSLER | 4670 508AD, 4670508AD |
|---|---|
| DODGE | 4670508AD |
| JEEP | 4670 508AD |
Related numbers
The same replacements also carry these original numbers:
4670 508AE4670 508AFK04670508AEK04670508AFK04670508AG00K04670508AB00K04670508AC00K04670508AD00K04670508AE00K04670508AF
Frequently asked
What part is 4670 508AD?
4670 508AD is an original number from DODGE, CHRYSLER and JEEP; the part type is Steering Links (control arm, trailing link, diagonal arm).
Which parts replace 4670 508AD?
NTY ZWD-CH-042 and TRISCAN 8500 80543.
Does 4670 508AD fit my car?
The replacements fit 20 vehicle versions from DODGE, CHRYSLER and LANCIA (2007–2026). Choose your car or enter its registration number and we show only what fits.
What does a replacement for 4670 508AD cost?
From €38.99 (NTY ZWD-CH-042). The dearest costs €55.54.
Is an equivalent part as good as the original?
An equivalent part is made to the dimensions and requirements of the same original number. Every row names its brand, so the choice can be made on the brand and on the figures above.
When does the part arrive?
Every row states its own delivery date, worked out from that part's own stock.




